Net present value (NPV) is the difference between the present value of a project's expected future cash flows and the amount invested today, with every future cash flow discounted at a chosen required rate of return.
How NPV works
Money received later is worth less than the same amount received now, because today's money can be put to work and because the future is uncertain. This is the idea behind the time value of money. NPV applies it systematically.
The steps are:
- Estimate the cash flow the project will produce in each period, including any final sale or recovery value.
- Choose a discount rate that reflects the return you could expect from alternatives of similar risk.
- Divide each cash flow by (1 + r) raised to the number of periods until it arrives.
- Add the discounted cash flows together and subtract the initial outlay.
In formula form:
NPV = −C₀ + C₁/(1+r) + C₂/(1+r)² + … + Cₙ/(1+r)ⁿ
Here C₀ is the upfront cost, Cₙ is the cash flow in year n, and r is the discount rate.
Worked example
A small business is considering buying equipment for 100,000 (₹100,000 or $100,000; the arithmetic is identical). It expects the equipment to generate net cash flows of 40,000 a year for three years, after which it has no value. All figures are hypothetical, and the business requires a 10% annual return.
| Year | Cash flow | Discount factor at 10% | Present value |
|---|---|---|---|
| 0 | −100,000 | 1.000 | −100,000 |
| 1 | 40,000 | 0.909 | 36,364 |
| 2 | 40,000 | 0.826 | 33,058 |
| 3 | 40,000 | 0.751 | 30,053 |
| NPV | −525 |
The total cash received is 120,000, which looks comfortably above the 100,000 cost. Yet the NPV is roughly −525, because the later cash flows are worth less in today's terms. At a 10% requirement, the project just fails to earn its keep.
Now test a lower discount rate of 8%. The present values become about 37,037, 34,294 and 31,753, summing to roughly 103,084. The NPV is then about +3,084. The same project flips from slightly negative to slightly positive, which shows how much the answer depends on the rate.
The decision rule
- NPV greater than zero: the project is expected to earn more than the required return and adds value.
- NPV equal to zero: the project earns exactly the required return.
- NPV less than zero: the project is expected to earn less than the required return and would reduce value.
When choosing between mutually exclusive projects, the one with the higher NPV generally creates more value, although size, timing and risk still deserve attention.
Why it matters to investors
NPV is the logic that sits underneath most valuation work. A discounted cash flow (DCF) valuation of a company is essentially an NPV of its expected free cash flow, and the result is an estimate of intrinsic value. Investors also use the idea to judge whether a company's capital spending is likely to create value, and whether management allocates capital sensibly.
It also explains why a higher discount rate lowers valuations, particularly for businesses whose cash flows arrive far in the future.
Strengths and limitations
- Strength: it accounts for timing and uses all cash flows, not just those before an arbitrary cut-off.
- Strength: it expresses value in currency terms, not as a percentage, so it shows the scale of value added.
- Limitation: it depends on forecasts that may be optimistic or simply wrong.
- Limitation: small changes in the discount rate can change the conclusion, as the example shows.
- Limitation: it does not automatically capture flexibility, such as the option to expand or abandon a project.
What to watch out for
- Using accounting profit instead of cash flow. NPV needs cash received and paid, including capital spending and working capital changes.
- Choosing a discount rate that is too low. A rate that ignores project risk makes weak projects look attractive.
- Ignoring inflation consistency. Use nominal cash flows with a nominal rate, or real cash flows with a real rate, never a mix.
- Forgetting the terminal period. Salvage value or ongoing cash flows after the forecast window can change the result materially.
- Relying on a single point estimate. Run optimistic, base and pessimistic scenarios.
Related concepts
The internal rate of return (IRR) is the discount rate at which NPV equals zero. The weighted average cost of capital (WACC) is commonly used as the discount rate for company-level projects. A margin of safety is a practical way to allow for forecast error.
This entry is for education and is not advice on any specific investment or project.